Description
After Hurricane Agnes raged through Maryland in 1976, downtown Frederick was left under as much as 3 feet of water in some places. With the downtown area shut down for months, city planners began working on the Carroll Creek flood control project, which took 30 years to come to fruition. The plan successfully put the creek underground in 1993, with a waist-deep 1.3 mile channel waterway with concrete banks 40 feet wide. Today we have the beautiful Carroll Creek Linear Park through downtown Frederick.
The $60 million flood control project made Carroll Creek Linear Park possible with its brick walkways, many bridges, fountains and sculptures. The first phase of the park, from Court Street to Carroll Street, was completed in 2006, costing $10.6 million.
Carroll Creek Linear Park has revitalized the downtown area with brick pedestrian paths, water features, planters with shade trees and plantings, pedestrian bridges and a 350-seat amphitheater. Over 73,000 square feet of commercial space has been built along the finished area of the park, creating and estimated 1500 jobs and $2.7 million in annual tax revenue for the City and the County.
Uploaded
April 17th, 2016
Statistics
Viewed 267 Times - Last Visitor from Fairfield, CT on 04/24/2024 at 9:04 AM
Embed
Share
Sales Sheet